INI, Intelligent Network Infrastructure

Real networks, verifiable results.

Seven projects where WiFi infrastructure redesign solved specific operational problems. Each case includes a PDF with technical detail.

Hospitality

Royalton Resorts

Royalton Resorts

Redesign of WiFi infrastructure for all-inclusive Caribbean resorts. Thousands of concurrent guests with streaming and video-call quality.

Download case
Corporate coworking

WeWork Mexico

WeWork Mexico

WiFi infrastructure deployment across multiple buildings in Mexico. Simultaneous video calls, per-company segregation and seamless roaming between rooms.

Download case
Tech distribution

Ingram Micro

Ingram Micro

WiFi infrastructure for logistics operations and corporate offices of the world's largest technology distributor.

Download case
Education

Colegio Americano de Tampico

Colegio Americano de Tampico

WiFi for bilingual education campus with thousands of students, teachers and visitors. Profile-based segregation and age-range parental control.

Download case
Biotech

Biosupport

Biosupport

WiFi network for labs and administrative areas with regulatory traceability and critical-traffic isolation requirements.

Download case
Industrial chemistry

Atotech

Atotech

WiFi for industrial plant with heavy machinery interference. Coverage across offices, production area and warehouses with metal walls.

Download case
Government

Chamber of Deputies (Mexico)

Chamber of Deputies (Mexico)

WiFi infrastructure for legislative venue. Segregation between deputies, staff, press and citizen networks with institutional security requirements.

Download case
Why us

Traditional integrator vs. INI.

We aren't just another integrator. We apply INIWAYS, our proprietary methodology, to every project we touch.

Traditional integrator

  • Quote per AP without site survey
  • Fixed brand due to vendor agreement
  • Deliver and disappear
  • No agreed success metrics
  • Support via channel escalation
  • "Eyeballed" design

INI

  • Site survey with professional hardware before quoting
  • Brand-agnostic: the one that best solves your problem
  • Continuous post-launch optimization
  • Success KPIs defined at kickoff
  • Local technical support in Mexico time zone
  • 3D predictive design + data validation
Method

INIWAYS, the methodology behind every project.

Seven steps that cover from diagnosis to measurable impact. Each letter is a phase with clear deliverables.

I · Investigate

Rigorous site survey with professional hardware. Measurements per band, interference, expected capacity.

N · Normalize

We translate the diagnosis into architecture design with specific hardware and budget.

I · Implement

Installation and configuration with continuous validation against the predictive design.

W · Ways

Continuous post-launch optimization, we don't close the project and disappear.

A · Analyze

We document learnings from every project to apply them to the next.

Y · Yield

Verifiable impact report: before/after metrics that back the ROI.

S · Sustain

Impact model with circular economy, reusable hardware, not junk at end of cycle.